Fjord 40

Dismantle old flaps.
Manufacture new flaps in stainless steel.
Installation of pistons.
Hydraulic pump installation.
Electrical system installation.

Transport of the ship from the wintering ship to the port.

Repair of blows in helmet.

Request Budget